|
 Originally Posted by nightdevil21
Okay how much time does HP need to produce these touchpads?
I think their already done or close to it.
500,000 for release day? or say 1,000,000 for distribution world wide?
how many can you make a day? say 2,000?
then how much time is need for shipping to distributors (1.5weeks) THEN to local stores (another week?)?
Do you think their DONE with the upgrades and at the point they are in mass production?
It's pretty simple. It's probably no more than 2-3 weeks from the time they leave the manufacture until they can reach consumers' hands; that's not the current hold up. The software (webOS 3.0) isn't ready yet. When it is, they'll start rolling off the production line.
|
|
|