Page 195 of 207 FirstFirst ... 95145185190191192193194195196197198199200205 ... LastLast
Results 3,881 to 3,900 of 4135
Like Tree55Likes
  1. #3881  
    Quote Originally Posted by WeeGee View Post
    Oh my.. The cleanup doesn't work on all these birthday events. Some of them are repeated, some not, but it doesn't clean either. Now I have to clean hundreds of them manually...
    Have you tried turning off the calendars in the accounts app? If you have then you might have to remove the google account all together. That may be faster than doing them 1 by 1.
    French Pre3, UK Pre2, US Veer, German gsm Pre, 680, garmin ique 3600 & still have my working palm pilot 1000 with the 1 Mb adapter

    Please remove UberCalendar and google sync behavior patches prior to system updates.
    patch Google calendar sync behavior for 2.x.x and TouchPad (Oauth2 and advanced sync requirements enabled)
    Preference guide for MetaView's UberCalendar patch
  2. #3882  
    Quote Originally Posted by frantid View Post
    Have you tried turning off the calendars in the accounts app? If you have then you might have to remove the google account all together. That may be faster than doing them 1 by 1.
    During the day I deleted all undefined events I found two years forth and back, one by one. I used AgendaZ to see them monthwise by switching off all calendars in AgendaZ.
    I don't want to turn off calendars on my Pre3 because there are a lot of unsynced events sitting on my Pre3, and I don't want to loose them.
    Now I can sync single events, they show up on Google after a minute or so, I didn't found one that doesn't sync. But I need a working automatic sync..

    Is there any way to program a verify, that means some code that checks if an event is on the Pre and on Google also, and if not, force a sync of that event? I don't know how many events are missing on my Google calendar from the last years, because I had small sync problems since the beginning.. If I found a not synced event, I usually changed the reminder time, that forced a sync of this single item. This worked until a month ago, when nothing helped to force any sync from Pre3 to Google. But I guess I missed one or another event in the past....
  3. #3883  
    I'm glad you got it working. I think it was probably one of those undefined events that was causing your sync problems.

    Unfortunately, there is no way to verify the calendars are accurate. At least not via a patch. What you describe is exactly what synergy is programmed to do. It's not perfect.

    What I do, is I have one account that belongs to my most important work calendars. I've got another account that has the others like holidays. That way I can take the secondary account off if it causes problems. The calendar is programmed to use a separate sync process for each google account. So my main calendar is isolated.

    It works fine as long as the sync system doesn't crash. Your logs are the only time I've seen the sync system crash. That's what that mini-core error was according to the dev forums.
  4. #3884  
    Quote Originally Posted by frantid View Post
    I'm glad you got it working. I think it was probably one of those undefined events that was causing your sync problems.

    Unfortunately, there is no way to verify the calendars are accurate. At least not via a patch. What you describe is exactly what synergy is programmed to do. It's not perfect.

    What I do, is I have one account that belongs to my most important work calendars. I've got another account that has the others like holidays. That way I can take the secondary account off if it causes problems. The calendar is programmed to use a separate sync process for each google account. So my main calendar is isolated.

    It works fine as long as the sync system doesn't crash. Your logs are the only time I've seen the sync system crash. That's what that mini-core error was according to the dev forums.
    But these undefined events weren't there before I removed the birthday calendar...

    Well, I still have an incomplete sync.. I can go on and sync all the missing events one by one (maybe 50?). But what about the future? I can't go on like that forever...

    I have one Google account with 5-10 calendars for different categories, but all of them fail to sync automatically...
  5. #3885  
    Here is a current log:

    undefined[2012-09-18 00:47:25] (12) call started.: 48
    [2012-09-18 00:47:25] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $before$ $sync$ = $48$
    [2012-09-18 00:47:25] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $after$ $sync$ = $12$
    [2012-09-18 00:47:27] (status) --->>.: 200
    [2012-09-18 00:47:28] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$26$:$16$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $02$:$47$:$28$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 00:47:29] (status) --->>.: 200
    [2012-09-18 00:47:30] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$54$:$53$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $02$:$47$:$30$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 00:49:27] (status) --->>.: 200
    [2012-09-18 00:49:30] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$54$:$53$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $02$:$49$:$30$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 00:49:31] (status) --->>.: 200
    [2012-09-18 00:49:31] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $02$:$49$:$31$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 00:49:34] (status) --->>.: 200
    [2012-09-18 00:49:34] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $02$:$49$:$34$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 00:49:43] (status) --->>.: 200
    [2012-09-18 00:49:43] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $02$:$49$:$43$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 00:49:44] (status) --->>.: 200
    [2012-09-18 00:49:45] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$54$:$53$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $02$:$49$:$45$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 00:49:46] (status) --->>.: 200
    [2012-09-18 00:49:46] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$54$:$53$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $02$:$49$:$46$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 00:49:47] (status) --->>.: 200
    [2012-09-18 00:56:23] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$54$:$53$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $02$:$56$:$23$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 00:56:24] (status) --->>.: 200
    [2012-09-18 00:56:24] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $02$:$56$:$24$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 00:56:29] (status) --->>.: 200
    [2012-09-18 00:56:29] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $02$:$56$:$29$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 00:57:25] (status) --->>.: 200
    [2012-09-18 00:57:26] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $02$:$57$:$26$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 00:57:30] (status) --->>.: 200
    [2012-09-18 00:57:30] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $02$:$57$:$30$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:01:48] (status) --->>.: 200
    [2012-09-18 01:01:48] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$01$:$48$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:01:49] (status) --->>.: 200
    [2012-09-18 01:01:49] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$01$:$49$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:01:49] (status) --->>.: 200
    [2012-09-18 01:01:51] (status) --->>.: 201
    [2012-09-18 01:01:52] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$54$:$53$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$01$:$51$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:01:52] (status) --->>.: 200
    [2012-09-18 01:01:53] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$54$:$53$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$01$:$53$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:01:54] (status) --->>.: 200
    [2012-09-18 01:01:54] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$54$:$53$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$01$:$54$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:01:55] (status) --->>.: 200
    [2012-09-18 01:01:55] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$01$:$55$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:01:55] (status) --->>.: 200
    [2012-09-18 01:01:55] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$01$:$55$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:01:56] (status) --->>.: 200
    [2012-09-18 01:01:56] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$01$:$56$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:01:57] (status) --->>.: 200
    [2012-09-18 01:01:57] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$57$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$01$:$57$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:01:58] (status) --->>.: 200
    [2012-09-18 01:01:58] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$57$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$01$:$58$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:01:59] (status) --->>.: 200
    [2012-09-18 01:01:59] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$57$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$01$:$59$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:01:59] (status) --->>.: 200
    [2012-09-18 01:02:00] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$02$:$00$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:02:00] (status) --->>.: 200
    [2012-09-18 01:02:00] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$02$:$00$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:02:01] (status) --->>.: 200
    [2012-09-18 01:02:01] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$02$:$01$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:02:01] (status) --->>.: 200
    [2012-09-18 01:02:01] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$02$:$01$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:02:02] (status) --->>.: 200
    [2012-09-18 01:02:02] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$02$:$02$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:02:04] (status) --->>.: 200
    [2012-09-18 01:02:05] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$02$:$05$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:02:06] (status) --->>.: 200
    [2012-09-18 01:02:06] (activitymanager[1596]) user.err: [core.messageService] No such file or directory (2) - sender='com.palm.service.calendar.google' method='adopt' payload='{"activityId":7404,"serial":515020925,"subscribe":true}'
    [2012-09-18 01:02:06] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $Error$: $palm$://$com$.$palm$.$activitymanager$/$adopt$ {&$quot$;$activityId$&$quot$;:$7404$,&$quot$;$subscribe$&$quot$;:$true$,&$quot$;$serial$&$quot$;:$515020925$}: $activityId$ $not$ $found$ $at$ $Object$.$create$ (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$structure$/$err$.$js$:$5$:$17$) $at$ /$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$comms$/$palmcall$.$js$:$158$:$16$ $at$ $Future$.&$lt$;$anonymous$&$gt$; (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$future$.$js$:$228$:$17$) $at$ $Timer$.$dispatch$ [$as$ $callback$] (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$queue$.$js$:$72$:$16$) $at$ $node$.$js$:$28$:$97$
    [2012-09-18 01:02:06] (Error) failed to adopt activity 7404 .: palm://com.palm.activitymanager/adopt {"activityId":7404,"subscribe":true,"serial":515020925}: activityId not found at Object.create (/usr/palm/frameworks/foundations/version/1.0/javascript/structure/err.jsjsjs:$5$:$17$) $at$ /$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$comms$/$palmcall$.$js$:$158$:$16$ $at$ $Future$.&$lt$;$anonymous$&$gt$; (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$future$.$js$:$228$:$17$) $at$ $Timer$.$dispatch$ [$as$ $callback$] (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$queue$.$js$:$72$:$16$) $at$ $node$.$js$:$28$:$97$
    [2012-09-18 01:02:06] (TypeError) error during command assistant complete().: Cannot call method 'then' of undefined
    [2012-09-18 01:02:06] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $Trying$ $to$ $complete$ $it$ $myself$
    [2012-09-18 01:16:05] (12) call started.: 48
    [2012-09-18 01:16:05] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $before$ $sync$ = $48$
    [2012-09-18 01:16:05] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $after$ $sync$ = $12$
    [2012-09-18 01:16:06] (status) --->>.: 200
    [2012-09-18 01:16:07] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$01$:$52$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$16$:$07$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:07] (status) --->>.: 200
    [2012-09-18 01:16:08] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$01$:$52$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$08$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:09] (status) --->>.: 200
    [2012-09-18 01:16:09] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$01$:$52$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$09$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:09] (status) --->>.: 200
    [2012-09-18 01:16:10] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$16$:$10$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:10] (status) --->>.: 200
    [2012-09-18 01:16:10] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$10$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:11] (status) --->>.: 200
    [2012-09-18 01:16:11] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$11$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:12] (status) --->>.: 200
    [2012-09-18 01:16:12] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$57$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$16$:$12$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:13] (status) --->>.: 200
    [2012-09-18 01:16:13] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$57$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$13$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:14] (status) --->>.: 200
    [2012-09-18 01:16:15] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$57$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$15$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:15] (status) --->>.: 200
    [2012-09-18 01:16:15] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$16$:$15$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:16] (status) --->>.: 200
    [2012-09-18 01:16:16] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$16$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:17] (status) --->>.: 200
    [2012-09-18 01:16:17] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$17$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:18] (status) --->>.: 200
    [2012-09-18 01:16:18] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$16$:$18$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:18] (status) --->>.: 200
    [2012-09-18 01:16:19] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$19$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:19] (status) --->>.: 200
    [2012-09-18 01:16:20] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$20$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:21] (status) --->>.: 200
    [2012-09-18 01:16:21] (status) --->>.: 201
    [2012-09-18 01:16:22] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$01$:$52$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$16$:$22$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:23] (status) --->>.: 200
    [2012-09-18 01:16:23] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$01$:$52$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$16$:$23$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:24] (status) --->>.: 200
    [2012-09-18 01:16:24] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$01$:$52$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$24$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:25] (status) --->>.: 200
    [2012-09-18 01:16:25] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$01$:$52$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$25$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:26] (status) --->>.: 200
    [2012-09-18 01:16:26] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$16$:$26$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:27] (status) --->>.: 200
    [2012-09-18 01:16:27] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$27$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:28] (status) --->>.: 200
    [2012-09-18 01:16:28] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$28$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:29] (status) --->>.: 200
    [2012-09-18 01:16:29] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$57$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$16$:$29$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:30] (status) --->>.: 200
    [2012-09-18 01:16:30] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$57$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$30$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:31] (status) --->>.: 200
    [2012-09-18 01:16:31] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$57$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$31$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:32] (status) --->>.: 200
    [2012-09-18 01:16:32] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$16$:$32$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:33] (status) --->>.: 200
    [2012-09-18 01:16:33] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$33$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:34] (status) --->>.: 200
    [2012-09-18 01:16:34] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$34$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:35] (status) --->>.: 200
    [2012-09-18 01:16:35] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $03$:$16$:$35$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:36] (status) --->>.: 200
    [2012-09-18 01:16:36] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$36$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:37] (status) --->>.: 200
    [2012-09-18 01:16:37] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $03$:$16$:$37$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 01:16:38] (status) --->>.: 200
  6. #3886  
    Quote Originally Posted by WeeGee View Post
    But these undefined events weren't there before I removed the birthday calendar...

    Well, I still have an incomplete sync.. I can go on and sync all the missing events one by one (maybe 50?). But what about the future? I can't go on like that forever...

    I have one Google account with 5-10 calendars for different categories, but all of them fail to sync automatically...
    Just to thing outside the box (and frantid will let us know if it's too far):
    1. Who's your carrier?
    2. Does your Google calendar have some interesting options in use (like sharing one or more calendars with others)?


    Just looking for other possible correlations...

    Tungsten E, Treo 650, Pre+ (3), Pre³ (2), TouchPad (2), & my trusty Treo BT headset (in use!)
    Posts: Save/Restore Backup Process & Batch File | Activated! (Verizon Pre³ Activation) | "Not Enough Space To Download" Fix
  7. #3887  
    Quote Originally Posted by bethel95 View Post
    Just to thing outside the box (and frantid will let us know if it's too far):
    1. Who's your carrier?
    1. Telekom D1.
      But I also use WiFi at home.

      Quote Originally Posted by bethel95 View Post
    2. Does your Google calendar have some interesting options in use (like sharing one or more calendars with others)?
    Quote Originally Posted by bethel95 View Post

    Just looking for other possible correlations...
    Yes, I share two calendars with my wife and she shares one with me.
  8. #3888  
    Quote Originally Posted by WeeGee View Post
    Now I can sync single events, they show up on Google after a minute or so, I didn't found one that doesn't sync. But I need a working automatic sync..
    Quote Originally Posted by WeeGee View Post
    But these undefined events weren't there before I removed the birthday calendar...

    Well, I still have an incomplete sync.. I can go on and sync all the missing events one by one (maybe 50?). But what about the future? I can't go on like that forever...

    I have one Google account with 5-10 calendars for different categories, but all of them fail to sync automatically...
    The undefined events might have had a bad parameter in them. It's not that they are undefined that stops sync. Being undefined is just a symptom of having something wrong with them. They should have been automatically removed after you removed those calendars.

    I think I misunderstood you. When you create a new event will it sync up to google? Is it only the old events that won't sync? I don't see anything in your logs that indicates an error. At least you are not getting a crash any more.

    The way the sync works in 2.x is change based. So the calendar and google keep a revision number per calendar. If you create a new event on webOS (or modify an old one), it increments the revision number. This should queue a database change sync. The sync then asks google for it's changes from that revision number forward. They then sync until the revision numbers match. WebOS always initiates the sync. It should start 2 different types automatically: 1. after a database change and 2. a periodic sync with an interval of 20 minutes. The 20 minute sync doesn't require a change in the webOS revision number, it is designed to query google for any changes from the last sync.

    So it is not designed to get all the events from the past and verify them. The only time this is done is when a calendar is added -- i.e. toggling off the calendars and back on after a while. So if you want to get the old events sync'd you will have to make a change to each one or use the new menu item in the edit scene. The menu item just requests a new revision number for that event, thus forcing a sync.

    I'll try to think of a way to force a sync that acts like an initial sync without having to delete the calendars. I'm not sure it would work to get your events which did not sync up to google. It would just verify what google has.
    French Pre3, UK Pre2, US Veer, German gsm Pre, 680, garmin ique 3600 & still have my working palm pilot 1000 with the 1 Mb adapter

    Please remove UberCalendar and google sync behavior patches prior to system updates.
    patch Google calendar sync behavior for 2.x.x and TouchPad (Oauth2 and advanced sync requirements enabled)
    Preference guide for MetaView's UberCalendar patch
  9. #3889  
    Here is a log from during the day, I changed two or three events during the timeframe of the log.

    [2012-09-18 12:27:47] (kernel) kern.info: [158051.020751] endar.google.jsjsjs $D$ $8077b590$ $5360$ $14130$ $1097$ $0x00000000$
    [2012-09-18 14:11:41] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $commandTimeout$ $in$ $com$.$palm$.$service$.$calendar$.$google$/$sync$
    [2012-09-18 14:11:42] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $Error$: $commandTimeout$ $in$ $com$.$palm$.$service$.$calendar$.$google$/$sync$ $at$ $Object$.$create$ (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$structure$/$err$.$js$:$5$:$17$) $at$ $Timer$.$callback$ (/$usr$/$palm$/$frameworks$/$mojoservice$/$version$/$1$.$0$/$javascript$/$controller_command$.$js$:$176$:$47$) $at$ $node$.$js$:$28$:$97$
    [2012-09-18 14:16:54] (activitymanager[1598]) user.err: [core.messageService] No such file or directory (2) - sender='com.palm.service.contacts.google' method='adopt' payload='{"activityId":3825,"serial":408554784,"subscribe":true}'
    [2012-09-18 14:16:54] (contacts.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$contacts$.$google$] $Error$: $palm$://$com$.$palm$.$activitymanager$/$adopt$ {&$quot$;$activityId$&$quot$;:$3825$,&$quot$;$subscribe$&$quot$;:$true$,&$quot$;$serial$&$quot$;:$408554784$}: $activityId$ $not$ $found$ $at$ $Object$.$create$ (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$structure$/$err$.$js$:$5$:$17$) $at$ /$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$comms$/$palmcall$.$js$:$158$:$16$ $at$ $Future$.&$lt$;$anonymous$&$gt$; (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$future$.$js$:$228$:$17$) $at$ $Timer$.$dispatch$ [$as$ $callback$] (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$queue$.$js$:$72$:$16$) $at$ $node$.$js$:$28$:$97$
    [2012-09-18 14:16:54] (Error) failed to adopt activity 3825 .: palm://com.palm.activitymanager/adopt {"activityId":3825,"subscribe":true,"serial":408554784}: activityId not found at Object.create (/usr/palm/frameworks/foundations/version/1.0/javascript/structure/err.jsjsjs:$5$:$17$) $at$ /$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$comms$/$palmcall$.$js$:$158$:$16$ $at$ $Future$.&$lt$;$anonymous$&$gt$; (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$future$.$js$:$228$:$17$) $at$ $Timer$.$dispatch$ [$as$ $callback$] (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$queue$.$js$:$72$:$16$) $at$ $node$.$js$:$28$:$97$
    [2012-09-18 14:16:54] (TypeError) error during command assistant complete().: Cannot call method 'then' of undefined
    [2012-09-18 14:16:54] (contacts.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$contacts$.$google$] $Trying$ $to$ $complete$ $it$ $myself$
    [2012-09-18 14:16:59] (12) call started.: 48
    [2012-09-18 14:16:59] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $before$ $sync$ = $48$
    [2012-09-18 14:16:59] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $after$ $sync$ = $12$
    [2012-09-18 14:17:02] (status) --->>.: 200
    [2012-09-18 14:17:02] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$25$:$03$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$02$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:03] (status) --->>.: 200
    [2012-09-18 14:17:03] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$25$:$03$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$03$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:04] (status) --->>.: 200
    [2012-09-18 14:17:04] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$25$:$03$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$04$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:05] (status) --->>.: 200
    [2012-09-18 14:17:06] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$06$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:07] (status) --->>.: 200
    [2012-09-18 14:17:07] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$07$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:08] (status) --->>.: 200
    [2012-09-18 14:17:08] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$08$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:09] (status) --->>.: 200
    [2012-09-18 14:17:09] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$27$:$50$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$09$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:10] (status) --->>.: 200
    [2012-09-18 14:17:11] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$27$:$50$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$11$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:12] (status) --->>.: 200
    [2012-09-18 14:17:12] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$27$:$50$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$12$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:13] (status) --->>.: 200
    [2012-09-18 14:17:14] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$14$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:15] (status) --->>.: 200
    [2012-09-18 14:17:15] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$15$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:16] (status) --->>.: 200
    [2012-09-18 14:17:16] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$16$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:17] (status) --->>.: 200
    [2012-09-18 14:17:17] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$17$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:17] (status) --->>.: 200
    [2012-09-18 14:17:17] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$17$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:19] (status) --->>.: 200
    [2012-09-18 14:17:20] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$20$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:21] (status) --->>.: 200
    [2012-09-18 14:17:22] (status) --->>.: 200
    [2012-09-18 14:17:22] (status) --->>.: 200
    [2012-09-18 14:17:24] (status) --->>.: 201
    [2012-09-18 14:17:26] (status) --->>.: 201
    [2012-09-18 14:17:28] (status) --->>.: 200
    [2012-09-18 14:17:29] (status) --->>.: 200
    [2012-09-18 14:17:32] (status) --->>.: 201
    [2012-09-18 14:17:34] (status) --->>.: 201
    [2012-09-18 14:17:36] (status) --->>.: 201
    [2012-09-18 14:17:39] (status) --->>.: 201
    [2012-09-18 14:17:43] (status) --->>.: 201
    [2012-09-18 14:17:43] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$25$:$03$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$43$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:45] (status) --->>.: 200
    [2012-09-18 14:17:45] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$25$:$03$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$45$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:46] (status) --->>.: 200
    [2012-09-18 14:17:48] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$25$:$03$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$48$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:49] (status) --->>.: 200
    [2012-09-18 14:17:50] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$50$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:51] (status) --->>.: 200
    [2012-09-18 14:17:51] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$51$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:52] (status) --->>.: 200
    [2012-09-18 14:17:52] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$52$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:53] (status) --->>.: 200
    [2012-09-18 14:17:53] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$27$:$50$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$53$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:55] (status) --->>.: 200
    [2012-09-18 14:17:55] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$27$:$50$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$55$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:57] (status) --->>.: 200
    [2012-09-18 14:17:57] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$27$:$50$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$17$:$57$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:17:58] (status) --->>.: 200
    [2012-09-18 14:18:00] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $03$:$27$:$50$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$18$:$00$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:18:01] (status) --->>.: 200
    [2012-09-18 14:18:01] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$18$:$01$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:18:03] (status) --->>.: 200
    [2012-09-18 14:18:03] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$18$:$03$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:18:04] (status) --->>.: 200
    [2012-09-18 14:18:04] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$18$:$04$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:18:06] (status) --->>.: 200
    [2012-09-18 14:18:06] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$18$:$06$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:18:07] (status) --->>.: 200
    [2012-09-18 14:18:07] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$18$:$07$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:18:08] (status) --->>.: 200
    [2012-09-18 14:18:08] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$18$:$08$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:18:09] (status) --->>.: 200
    [2012-09-18 14:33:14] (12) call started.: 48
    [2012-09-18 14:33:14] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $before$ $sync$ = $48$
    [2012-09-18 14:33:14] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $after$ $sync$ = $12$
    [2012-09-18 14:33:17] (status) --->>.: 200
    [2012-09-18 14:33:17] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$43$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$33$:$17$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:19] (status) --->>.: 200
    [2012-09-18 14:33:19] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$43$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$33$:$19$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:23] (status) --->>.: 200
    [2012-09-18 14:33:23] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$43$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$33$:$23$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:25] (status) --->>.: 200
    [2012-09-18 14:33:25] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$33$:$25$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:27] (status) --->>.: 200
    [2012-09-18 14:33:27] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$33$:$27$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:29] (status) --->>.: 200
    [2012-09-18 14:33:29] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$33$:$29$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:30] (status) --->>.: 200
    [2012-09-18 14:33:31] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$44$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$33$:$31$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:32] (status) --->>.: 200
    [2012-09-18 14:33:32] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$44$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$33$:$32$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:34] (status) --->>.: 200
    [2012-09-18 14:33:34] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$44$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$33$:$34$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:35] (status) --->>.: 200
    [2012-09-18 14:33:35] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$33$:$35$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:36] (status) --->>.: 200
    [2012-09-18 14:33:36] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$33$:$36$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:37] (status) --->>.: 200
    [2012-09-18 14:33:37] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$33$:$37$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:38] (status) --->>.: 200
    [2012-09-18 14:33:38] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $16$:$33$:$38$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:39] (status) --->>.: 200
    [2012-09-18 14:33:40] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$33$:$40$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:41] (status) --->>.: 200
    [2012-09-18 14:33:41] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $16$:$33$:$41$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 14:33:42] (status) --->>.: 200
    [2012-09-18 15:08:59] (12) call started.: 48
    [2012-09-18 15:08:59] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $before$ $sync$ = $48$
    [2012-09-18 15:08:59] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $after$ $sync$ = $12$
    [2012-09-18 15:09:02] (status) --->>.: 200
    [2012-09-18 15:09:02] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$43$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$09$:$02$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:09:03] (status) --->>.: 200
    [2012-09-18 15:09:04] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$43$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$09$:$04$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:09:05] (status) --->>.: 200
    [2012-09-18 15:09:05] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$43$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$09$:$05$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:09:07] (status) --->>.: 200
    [2012-09-18 15:09:07] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$09$:$07$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:09:08] (status) --->>.: 200
    [2012-09-18 15:09:09] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$09$:$09$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:09:17] (status) --->>.: 200
    [2012-09-18 15:09:18] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$09$:$18$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:09:20] (status) --->>.: 200
    [2012-09-18 15:09:20] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$20$:$24$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$09$:$20$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:09:22] (status) --->>.: 200
    [2012-09-18 15:09:23] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$20$:$24$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$09$:$23$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:09:33] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $Error$: $NO_CONNECTIVITY$ - $httpClient$ $error$ $ETIMEDOUT$, $Connection$ $timed$ $out$
    [2012-09-18 15:09:33] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $Error$: $NO_CONNECTIVITY$ - $httpClient$ $error$ $ETIMEDOUT$, $Connection$ $timed$ $out$
    [2012-09-18 15:09:33] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $Error$: $NO_CONNECTIVITY$ - $httpClient$ $error$ $ETIMEDOUT$, $Connection$ $timed$ $out$
    [2012-09-18 15:09:33] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $Error$: $NO_CONNECTIVITY$ - $httpClient$ $error$ $ETIMEDOUT$, $Connection$ $timed$ $out$
    [2012-09-18 15:09:33] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $Error$: $NO_CONNECTIVITY$ - $httpClient$ $error$ $ETIMEDOUT$, $Connection$ $timed$ $out$
    [2012-09-18 15:09:33] (Error) in getRemoteChanges.gotReply:: NO_CONNECTIVITY - httpClient error ETIMEDOUT, Connection timed out
    [2012-09-18 15:09:33] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $Error$: $NO_CONNECTIVITY$ - $httpClient$ $error$ $ETIMEDOUT$, $Connection$ $timed$ $out$
    [2012-09-18 15:09:33] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TypeError$: $Cannot$ $call$ $method$ '$indexOf$' $of$ $undefined$ $at$ $clazz$.&$lt$;$anonymous$&$gt$; (/$usr$/$palm$/$frameworks$/$mojoservice$.$transport$.$sync$/$version$/$1$.$0$/$javascript$/$commands$/$synccommand$.$js$:$368$:$44$) $at$ $Future$.$_maybeDispatch$ (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$future$.$js$:$300$:$17$) $at$ $Future$.&$lt$;$anonymous$&$gt$; (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$future$.$js$:$246$:$9$) $at$ $Timer$.$dispatch$ [$as$ $callback$] (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$queue$.$js$:$72$:$16$) $at$ $node$.$js$:$28$:$97$
    [2012-09-18 15:34:50] (12) call started.: 48
    [2012-09-18 15:34:50] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $before$ $sync$ = $48$
    [2012-09-18 15:34:50] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $after$ $sync$ = $12$
    [2012-09-18 15:34:52] (status) --->>.: 200
    [2012-09-18 15:34:52] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$43$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$34$:$52$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:34:53] (status) --->>.: 200
    [2012-09-18 15:34:54] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$43$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$34$:$54$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:34:55] (status) --->>.: 200
    [2012-09-18 15:34:55] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$43$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$34$:$55$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:34:56] (status) --->>.: 200
    [2012-09-18 15:34:56] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$34$:$56$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:34:57] (status) --->>.: 200
    [2012-09-18 15:34:57] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$34$:$57$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:34:59] (status) --->>.: 200
    [2012-09-18 15:34:59] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$34$:$59$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:00] (status) --->>.: 200
    [2012-09-18 15:35:00] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$20$:$24$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$00$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:01] (status) --->>.: 200
    [2012-09-18 15:35:01] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$20$:$24$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$01$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:02] (status) --->>.: 200
    [2012-09-18 15:35:02] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$20$:$24$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$02$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:03] (status) --->>.: 200
    [2012-09-18 15:35:03] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$03$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:04] (status) --->>.: 200
    [2012-09-18 15:35:04] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$04$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:05] (status) --->>.: 200
    [2012-09-18 15:35:06] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$06$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:07] (status) --->>.: 200
    [2012-09-18 15:35:07] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$07$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:08] (status) --->>.: 200
    [2012-09-18 15:35:08] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$08$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:09] (status) --->>.: 200
    [2012-09-18 15:35:10] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$10$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:11] (status) --->>.: 200
    [2012-09-18 15:35:12] (status) --->>.: 201
    [2012-09-18 15:35:13] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$43$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$13$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:14] (status) --->>.: 200
    [2012-09-18 15:35:14] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$43$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$14$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:15] (status) --->>.: 200
    [2012-09-18 15:35:16] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$17$:$43$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$15$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:17] (status) --->>.: 200
    [2012-09-18 15:35:17] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$17$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:18] (status) --->>.: 200
    [2012-09-18 15:35:18] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$18$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:19] (status) --->>.: 200
    [2012-09-18 15:35:19] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$19$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:20] (status) --->>.: 200
    [2012-09-18 15:35:20] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$20$:$24$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$20$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:21] (status) --->>.: 200
    [2012-09-18 15:35:22] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$20$:$24$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$22$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:22] (status) --->>.: 200
    [2012-09-18 15:35:23] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$20$:$24$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$23$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:24] (status) --->>.: 200
    [2012-09-18 15:35:24] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $16$:$20$:$24$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$24$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:25] (status) --->>.: 200
    [2012-09-18 15:35:25] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$25$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:26] (status) --->>.: 200
    [2012-09-18 15:35:26] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$26$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:28] (status) --->>.: 200
    [2012-09-18 15:35:28] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$28$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:29] (status) --->>.: 200
    [2012-09-18 15:35:29] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$29$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:30] (status) --->>.: 200
    [2012-09-18 15:35:30] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$30$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:31] (status) --->>.: 200
    [2012-09-18 15:35:32] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $17$:$35$:$32$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 15:35:33] (status) --->>.: 200
    [2012-09-18 15:35:33] (activitymanager[1598]) user.err: [core.messageService] No such file or directory (2) - sender='com.palm.service.calendar.google' method='adopt' payload='{"activityId":4054,"serial":2041797925,"subscribe":true}'
    [2012-09-18 15:35:33] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $Error$: $palm$://$com$.$palm$.$activitymanager$/$adopt$ {&$quot$;$activityId$&$quot$;:$4054$,&$quot$;$subscribe$&$quot$;:$true$,&$quot$;$serial$&$quot$;:$2041797925$}: $activityId$ $not$ $found$ $at$ $Object$.$create$ (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$structure$/$err$.$js$:$5$:$17$) $at$ /$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$comms$/$palmcall$.$js$:$158$:$16$ $at$ $Future$.&$lt$;$anonymous$&$gt$; (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$future$.$js$:$228$:$17$) $at$ $Timer$.$dispatch$ [$as$ $callback$] (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$queue$.$js$:$72$:$16$) $at$ $node$.$js$:$28$:$97$
    [2012-09-18 15:35:33] (Error) failed to adopt activity 4054 .: palm://com.palm.activitymanager/adopt {"activityId":4054,"subscribe":true,"serial":2041797925}: activityId not found at Object.create (/usr/palm/frameworks/foundations/version/1.0/javascript/structure/err.jsjsjs:$5$:$17$) $at$ /$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$comms$/$palmcall$.$js$:$158$:$16$ $at$ $Future$.&$lt$;$anonymous$&$gt$; (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$future$.$js$:$228$:$17$) $at$ $Timer$.$dispatch$ [$as$ $callback$] (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$queue$.$js$:$72$:$16$) $at$ $node$.$js$:$28$:$97$
    [2012-09-18 15:35:33] (TypeError) error during command assistant complete().: Cannot call method 'then' of undefined
    [2012-09-18 15:35:33] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $Trying$ $to$ $complete$ $it$ $myself$
    [2012-09-18 16:15:39] (12) call started.: 48
    [2012-09-18 16:15:39] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $before$ $sync$ = $48$
    [2012-09-18 16:15:39] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $after$ $sync$ = $12$
    [2012-09-18 16:15:42] (status) --->>.: 200
    [2012-09-18 16:20:25] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$14$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $18$:$20$:$25$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:20:34] (status) --->>.: 200
    [2012-09-18 16:20:36] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$14$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $18$:$20$:$36$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:23:04] (status) --->>.: 200
    [2012-09-18 16:23:04] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$14$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $18$:$23$:$04$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:23:06] (status) --->>.: 200
    [2012-09-18 16:23:06] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $18$:$23$:$06$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:23:08] (status) --->>.: 200
    [2012-09-18 16:23:08] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $18$:$23$:$08$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:23:10] (status) --->>.: 200
    [2012-09-18 16:23:10] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $18$:$23$:$10$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:23:12] (status) --->>.: 200
    [2012-09-18 16:23:13] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$14$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $18$:$23$:$13$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:23:15] (status) --->>.: 200
    [2012-09-18 16:23:15] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$14$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $18$:$23$:$15$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:28:05] (status) --->>.: 200
    [2012-09-18 16:28:06] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$14$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $18$:$28$:$06$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:28:08] (status) --->>.: 200
    [2012-09-18 16:28:08] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $18$:$28$:$08$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:28:11] (status) --->>.: 200
    [2012-09-18 16:28:11] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $18$:$28$:$11$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:28:27] (status) --->>.: 200
    [2012-09-18 16:28:27] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $18$:$28$:$27$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:28:29] (status) --->>.: 200
    [2012-09-18 16:28:29] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $18$:$28$:$29$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:28:37] (status) --->>.: 200
    [2012-09-18 16:28:37] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $18$:$28$:$37$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:28:51] (status) --->>.: 200
    [2012-09-18 16:28:59] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $18$:$28$:$59$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 16:29:08] (status) --->>.: 200
    [2012-09-18 20:01:56] (12) call started.: 48
    [2012-09-18 20:01:56] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $before$ $sync$ = $48$
    [2012-09-18 20:01:56] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TWEAKS$ $preference$: $after$ $sync$ = $12$
    [2012-09-18 20:01:57] (status) --->>.: 200
    [2012-09-18 20:01:58] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$14$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $22$:$01$:$58$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:01:58] (status) --->>.: 200
    [2012-09-18 20:01:58] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$14$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $22$:$01$:$58$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:00] (status) --->>.: 200
    [2012-09-18 20:02:00] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Privat$' $from$ $Tue$ $Sep$ $18$ $2012$ $17$:$35$:$14$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $22$:$02$:$00$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:01] (status) --->>.: 200
    [2012-09-18 20:02:01] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $22$:$02$:$01$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:02] (status) --->>.: 200
    [2012-09-18 20:02:02] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $22$:$02$:$02$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:03] (status) --->>.: 200
    [2012-09-18 20:02:03] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ &$amp$; $Wolfgang$' $from$ $Tue$ $Sep$ $18$ $2012$ $00$:$05$:$46$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $22$:$02$:$03$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:05] (status) --->>.: 200
    [2012-09-18 20:02:05] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $17$:$36$:$48$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $22$:$02$:$05$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:06] (status) --->>.: 200
    [2012-09-18 20:02:07] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $17$:$36$:$48$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $22$:$02$:$07$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:07] (status) --->>.: 200
    [2012-09-18 20:02:08] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Wolfgang$ - $Job$' $from$ $Tue$ $Sep$ $18$ $2012$ $17$:$36$:$48$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $22$:$02$:$08$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:09] (status) --->>.: 200
    [2012-09-18 20:02:09] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $22$:$02$:$09$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:11] (status) --->>.: 200
    [2012-09-18 20:02:11] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $22$:$02$:$11$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:13] (status) --->>.: 200
    [2012-09-18 20:02:13] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Zoom$' $from$ $Thu$ $Sep$ $06$ $2012$ $00$:$01$:$29$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $22$:$02$:$13$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:14] (status) --->>.: 200
    [2012-09-18 20:02:14] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Update$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Tue$ $Sep$ $18$ $2012$ $22$:$02$:$14$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:15] (status) --->>.: 200
    [2012-09-18 20:02:15] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $22$:$02$:$15$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:16] (status) --->>.: 200
    [2012-09-18 20:02:16] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Nora$ $B$. $Hagen$' $from$ $Sun$ $Sep$ $16$ $2012$ $13$:$56$:$19$ $GMT$+$0200$ ($CEST$) $to$ $Wed$ $Sep$ $18$ $2013$ $22$:$02$:$16$ $GMT$+$0200$ ($CEST$)
    [2012-09-18 20:02:17] (status) --->>.: 200
    [2012-09-18 20:02:30] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TypeError$: $Cannot$ $read$ $property$ '$status$' $of$ $undefined$ $at$ $clazz$.&$lt$;$anonymous$&$gt$; ($javascript$/$assistants$/$syncassistant$.$js$:$954$:$22$) $at$ $Future$.&$lt$;$anonymous$&$gt$; (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$future$.$js$:$228$:$17$) $at$ $Timer$.$dispatch$ [$as$ $callback$] (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$queue$.$js$:$72$:$16$) $at$ $node$.$js$:$28$:$97$
    [2012-09-18 20:02:30] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TypeError$: $Cannot$ $read$ $property$ '$status$' $of$ $undefined$ $at$ $clazz$.&$lt$;$anonymous$&$gt$; ($javascript$/$assistants$/$syncassistant$.$js$:$954$:$22$) $at$ $Future$.&$lt$;$anonymous$&$gt$; (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$future$.$js$:$228$:$17$) $at$ $Timer$.$dispatch$ [$as$ $callback$] (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$queue$.$js$:$72$:$16$) $at$ $node$.$js$:$28$:$97$
    [2012-09-18 20:02:30] (TypeError) in getFirstRemoteMatches.gotReply:: Cannot read property 'status' of undefined
    [2012-09-18 20:02:30] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $TypeError$: $Cannot$ $read$ $property$ '$status$' $of$ $undefined$ $at$ $clazz$.&$lt$;$anonymous$&$gt$; ($javascript$/$assistants$/$syncassistant$.$js$:$954$:$22$) $at$ $Future$.&$lt$;$anonymous$&$gt$; (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$future$.$js$:$228$:$17$) $at$ $Timer$.$dispatch$ [$as$ $callback$] (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$queue$.$js$:$72$:$16$) $at$ $node$.$js$:$28$:$97$
    [2012-09-18 20:02:31] (activitymanager[1598]) user.err: [core.messageService] No such file or directory (2) - sender='com.palm.service.calendar.google' method='adopt' payload='{"activityId":4119,"serial":321581927,"subscribe":true}'
    [2012-09-18 20:02:31] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $Error$: $palm$://$com$.$palm$.$activitymanager$/$adopt$ {&$quot$;$activityId$&$quot$;:$4119$,&$quot$;$subscribe$&$quot$;:$true$,&$quot$;$serial$&$quot$;:$321581927$}: $activityId$ $not$ $found$ $at$ $Object$.$create$ (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$structure$/$err$.$js$:$5$:$17$) $at$ /$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$comms$/$palmcall$.$js$:$158$:$16$ $at$ $Future$.&$lt$;$anonymous$&$gt$; (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$future$.$js$:$228$:$17$) $at$ $Timer$.$dispatch$ [$as$ $callback$] (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$queue$.$js$:$72$:$16$) $at$ $node$.$js$:$28$:$97$
    [2012-09-18 20:02:31] (Error) failed to adopt activity 4119 .: palm://com.palm.activitymanager/adopt {"activityId":4119,"subscribe":true,"serial":321581927}: activityId not found at Object.create (/usr/palm/frameworks/foundations/version/1.0/javascript/structure/err.jsjsjs:$5$:$17$) $at$ /$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$comms$/$palmcall$.$js$:$158$:$16$ $at$ $Future$.&$lt$;$anonymous$&$gt$; (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$future$.$js$:$228$:$17$) $at$ $Timer$.$dispatch$ [$as$ $callback$] (/$usr$/$palm$/$frameworks$/$foundations$/$version$/$1$.$0$/$javascript$/$control$/$queue$.$js$:$72$:$16$) $at$ $node$.$js$:$28$:$97$
    [2012-09-18 20:02:31] (TypeError) error during command assistant complete().: Cannot call method 'then' of undefined
    [2012-09-18 20:02:31] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] $Trying$ $to$ $complete$ $it$ $myself$


    -- Sent from my Palm Pre3 using Forums
    HP Pre³ (GSM, webOS 2.2.4, UberKernel: 1.68GHz On Demand), Palm Pre GSM, Palm Treo 680, Garmin iQue 3600, Palm III
  10. #3890  
    Quote Originally Posted by frantid View Post
    The undefined events might have had a bad parameter in them. It's not that they are undefined that stops sync. Being undefined is just a symptom of having something wrong with them. They should have been automatically removed after you removed those calendars.

    I think I misunderstood you. When you create a new event will it sync up to google? Is it only the old events that won't sync? I don't see anything in your logs that indicates an error. At least you are not getting a crash any more.
    Well, before the cleanup, nothing synced from my Pre3 to Google, even new events.
    After the cleanup, new or changed events sync.
    Before the complete sync stop some weeks ago, I often had the problem that an event didn't sync after I created it on the Pre3 (even after days of waiting), but it synced after I changed something. Maybe it failed the first sync because of bad internet connectivity, but I don't know why it didn't sync later when I had a stable WiFi connection.
    So your tips helped me big way, THANKS A LOT!

    Quote Originally Posted by frantid View Post
    The way the sync works in 2.x is change based. So the calendar and google keep a revision number per calendar. If you create a new event on webOS (or modify an old one), it increments the revision number. This should queue a database change sync. The sync then asks google for it's changes from that revision number forward. They then sync until the revision numbers match. WebOS always initiates the sync. It should start 2 different types automatically: 1. after a database change and 2. a periodic sync with an interval of 20 minutes. The 20 minute sync doesn't require a change in the webOS revision number, it is designed to query google for any changes from the last sync.

    So it is not designed to get all the events from the past and verify them. The only time this is done is when a calendar is added -- i.e. toggling off the calendars and back on after a while. So if you want to get the old events sync'd you will have to make a change to each one or use the new menu item in the edit scene. The menu item just requests a new revision number for that event, thus forcing a sync.
    Interesting information, good to know.

    Quote Originally Posted by frantid View Post
    I'll try to think of a way to force a sync that acts like an initial sync without having to delete the calendars. I'm not sure it would work to get your events which did not sync up to google. It would just verify what google has.
    Maybe just iterate over all events of a calendar and request a new revision number? And log all possible errors, even if they are handled quietly right now.
  11. #3891  
    Quote Originally Posted by frantid View Post
    However, to get the most out of the changes, you should install all 3. If you have problems, please state whether you have installed all 3 patches. These are for 2.2.4 only (any device running 2.2.4). To test these patches: You must uninstall any installed versions. Restart Luna. Install these locally, using Internalz Pro or webOS Quick Install. Restart Luna.
    these are test patches, they might solve sync problmes I have with my calendar(s). but since they are test status and one has to uninstall first, is the final version going to be "updatable" ?

    I just don´t want to install and uninstall all over, since I found that fiddling with these patches makes calendar weird for some time, it takes some time ´till everything´s as it was before. and it takes time to re-set all of those fantastic options back the way they were
  12. #3892  
    Quote Originally Posted by juggernaut View Post
    these are test patches, they might solve sync problmes I have with my calendar(s). but since they are test status and one has to uninstall first, is the final version going to be "updatable" ?

    I just don´t want to install and uninstall all over, since I found that fiddling with these patches makes calendar weird for some time, it takes some time ´till everything´s as it was before. and it takes time to re-set all of those fantastic options back the way they were
    Hi, yes.

    I'll get some form of these patches up and published on Preware. Which means you should be able to go from a Preware version to a Preware version by using update.

    I'm working on the patches. I learned a little bit more about the sync process in helping toaste and WeeGee.

    So currently I'm working on adding some advanced sync requirements. So you could choose, whether you want sync to use wifi and/or phone network data, a minimum battery level required, set a custom sync interval -- plus whether these limits should apply to contacts from the same account. Very much like and inspired by greenoyster's tweakable pim sync.

    It won't affect exchange. It can't do wifi ssid's, maybe can mode switcher do this? It will be configured by account and enabled or disabled by account in the calendar. Completely disabled via tweaks.

    edit: plus I'm trying to find a way to force a full sync, like the initial sync (without having to remove your calendars)
    Attached Images Attached Images
    French Pre3, UK Pre2, US Veer, German gsm Pre, 680, garmin ique 3600 & still have my working palm pilot 1000 with the 1 Mb adapter

    Please remove UberCalendar and google sync behavior patches prior to system updates.
    patch Google calendar sync behavior for 2.x.x and TouchPad (Oauth2 and advanced sync requirements enabled)
    Preference guide for MetaView's UberCalendar patch
  13. #3893  
    Quote Originally Posted by frantid View Post
    Hi, yes.
    ah, OK. I´ve already tried the patches (except the framwork one) and found that the new behaviour patch doesn´t show up in tweaks. I´ve returned to the old one (the one avail through preware). I guess I´ll wait for the preware versions then.

    Quote Originally Posted by frantid View Post
    So currently I'm working on adding some advanced sync requirements. So you could choose, whether you want sync to use wifi and/or phone network data, a minimum battery level required, set a custom sync interval -- plus whether these limits should apply to contacts from the same account. Very much like and inspired by greenoyster's tweakable pim sync.
    that´s nice! should we stay away from greenoyster´s patch then? I´ve hesitated to install, because uninstalling seems to require unsetting and re-setting the use of calendar/contacts, and that´s what I try to avoid. with more than 10.000 calendar entries and 1.000+ contacts this procedure takes about 3 days to fully complete - with webOS´ onboard sync frequency, that is.

    Quote Originally Posted by frantid View Post
    edit: plus I'm trying to find a way to force a full sync, like the initial sync (without having to remove your calendars)
    great!!

    Quote Originally Posted by frantid View Post
    It can't do wifi ssid's, maybe can mode switcher do this?
    yes, modeswitcher can do SSID´s. you can set a trigger "connected to ...SSID" or "disconnected from ... SSID"
  14. #3894  
    Quote Originally Posted by juggernaut View Post
    ah, OK. I´ve already tried the patches (except the framwork one) and found that the new behaviour patch doesn´t show up in tweaks. I´ve returned to the old one (the one avail through preware). I guess I´ll wait for the preware versions then.
    With the local version of the sync behaviors patch, you have to add the json file for tweaks support manually. I completely understand the need to hold off testing for your situation.

    that´s nice! should we stay away from greenoyster´s patch then? I´ve hesitated to install, because uninstalling seems to require unsetting and re-setting the use of calendar/contacts, and that´s what I try to avoid. with more than 10.000 calendar entries and 1.000+ contacts this procedure takes about 3 days to fully complete - with webOS´ onboard sync frequency, that is.
    The framework patch will interfere with greenoyster's patch(they modify the same file), which is another reason I'm testing adding that functionality into UC and the sync behaviors patch. I'm still testiing various changes to see if they will work. If you want to try greenoyster's patch in the mean time, go ahead. It currently only conflicts with the framework patch. When I update Preware, you will most likely have to remove it. I'll post details when I submit the update to Preware.

    yes, modeswitcher can do SSID´s. you can set a trigger "connected to ...SSID" or "disconnected from ... SSID"
    Hopefully, people can use mode switcher then to set SSID triggers. I don't want duplicate functions from mode switcher, it just makes troubleshooting that much harder.
    French Pre3, UK Pre2, US Veer, German gsm Pre, 680, garmin ique 3600 & still have my working palm pilot 1000 with the 1 Mb adapter

    Please remove UberCalendar and google sync behavior patches prior to system updates.
    patch Google calendar sync behavior for 2.x.x and TouchPad (Oauth2 and advanced sync requirements enabled)
    Preference guide for MetaView's UberCalendar patch
  15. #3895  
    Quote Originally Posted by frantid View Post
    With the local version of the sync behaviors patch, you have to add the json file for tweaks support manually.
    Oh, I might forgot this one, shame on me

    EDIT: where can I find the JSON txt file?


    Quote Originally Posted by frantid View Post
    The framework patch will interfere with greenoyster's patch ...
    I´ll leave it alone then

    Quote Originally Posted by frantid View Post
    Hopefully, people can use mode switcher then to set SSID triggers.
    just curious: I try to think of what you´d need SSIDs for. MS uses them only as a trigger for something, and that "something" can only be changing a setting, not some action. are you going to make use of MS´s "action extensions", so that one could go like

    "if you get in the range of a network named MY--SUPERFAST-RELIABLE-WLAN, you´ll go right ahead and do a full sync of all accounts, otherwise just sync changes" ?


    that sounds very, very nice
  16. #3896  
    Quote Originally Posted by juggernaut View Post
    Oh, I might forgot this one, shame on me

    EDIT: where can I find the JSON txt file?
    Here: Google Calendar Sync Behaviors patch

    just curious: I try to think of what you´d need SSIDs for. MS uses them only as a trigger for something, and that "something" can only be changing a setting, not some action. are you going to make use of MS´s "action extensions", so that one could go like

    "if you get in the range of a network named MY--SUPERFAST-RELIABLE-WLAN, you´ll go right ahead and do a full sync of all accounts, otherwise just sync changes" ?


    that sounds very, very nice
    That does sound nice.

    I think it was gizmo21 who brought up the idea of only sync'ing when connected to a specified SSID.

    However, the palm Activity Manager service is not configured to look for SSID's. So I can't do it right now. I have no experience with mode switcher, I've read the wiki. But I'd need more info to learn how to interact with it from a service. Got a good developer type link for it?
    French Pre3, UK Pre2, US Veer, German gsm Pre, 680, garmin ique 3600 & still have my working palm pilot 1000 with the 1 Mb adapter

    Please remove UberCalendar and google sync behavior patches prior to system updates.
    patch Google calendar sync behavior for 2.x.x and TouchPad (Oauth2 and advanced sync requirements enabled)
    Preference guide for MetaView's UberCalendar patch
  17. #3897  
    Quote Originally Posted by frantid View Post
    I think it was gizmo21 who brought up the idea of only sync'ing when connected to a specified SSID.
    to me it´s not so much to sync at all, but which way to sync that makes this interesting. I guess everybody with anything else than an unlimited plan might be interested

    Quote Originally Posted by frantid View Post
    However, the palm Activity Manager service is not configured to look for SSID's. So I can't do it right now. I have no experience with mode switcher, I've read the wiki. But I'd need more info to learn how to interact with it from a service. Got a good developer type link for it?
    I´m sorry, I´m a user, no developer all I ever needed was in here: Application:ModeSwitcher - WebOS Internals
    but you´ve read that already.

    MS can look for SSID´s, thats why you can use them as a trigger. but as far as I know it lacks the functionality to do anything else than set a setting, launch an application or a service.

    there´s a menu item for "action extensions", so it seems one´s able to extend actions like with plug-ins, but I´ve never seen anything that would make use of it - all I know is that the "Advanced ...." patches from sconix extend MS´s functionality by adding "setting extensions".
  18. #3898  
    Quote Originally Posted by juggernaut View Post
    MS can look for SSID´s, thats why you can use them as a trigger. but as far as I know it lacks the functionality to do anything else than set a setting, launch an application or a service.

    there´s a menu item for "action extensions", so it seems one´s able to extend actions like with plug-ins, but I´ve never seen anything that would make use of it - all I know is that the "Advanced ...." patches from sconix extend MS´s functionality by adding "setting extensions".
    I added the requirements of "charging" and "docked" to the optional requirements. That way if a person selects wifi and docked. I imagine those places only overlap in places where the wifi is trusted.

    I think I'm going to leave it at that and not explore more of mode switcher extension development.
    French Pre3, UK Pre2, US Veer, German gsm Pre, 680, garmin ique 3600 & still have my working palm pilot 1000 with the 1 Mb adapter

    Please remove UberCalendar and google sync behavior patches prior to system updates.
    patch Google calendar sync behavior for 2.x.x and TouchPad (Oauth2 and advanced sync requirements enabled)
    Preference guide for MetaView's UberCalendar patch
    gizmo21 likes this.
  19. #3899  
    12 Feb 2015 Added appid to call to MetaView's mwatch app.

    11 Feb 2015 Updated to handle errors in mixed environments, i.e. using several methods to manage the calendar -- calDav, google api, android.

    2014-12-25: Updated to fix display of alarms and new version of Advanced Sync Requirements. Sync requirements moved to accounts app with the google_oauth2 patches.

    2013-04-09: fix for deleting undefined events all versions

    edit: 4 Jan 2013 fix 2.2.4 for repeating events with interval set.

    edit: 29 Oct: Added regional just type event capability. See here: UberCalendar: Enhanced calendar patch

    edit: 13 Oct: Sync behavior patch and json file removed and posted in the sync behaviors thread first post. See signature for link.

    edit: 10 Oct: Added versions for 2.1 and Veers that aren't running 2.2.4.

    2.1 webOS ---ubercalendar21_4-21.patch
    2.1.1 webOS EU Veer -- ubercalendarVEER_WR211_2-21.patch
    ATT 2.1.2 webOS Veer -- ubercalendarVEER_212-21.patch

    edit: 5 Oct: updated UC and sync behaviors patches. I added a sync time frame. You can choose a start and stop time for syncs. You have to turn off "sync all day", adjust the times. Don't forget to push the set requirements button. If you want it to sync all the time, just put "sync all day" to on. You can still force a manual sync or enable an account. It will sync those at all times.

    edit: 29 Sept: updated the google sync behavior patch. modified the periodic sync behavior.

    edit: 26 Sept. modified how requirements are removed from the activity manager. see new google sync behavior patch. resubmitted to Preware.

    I have updated versions of UC and the google sync behaviors patch. They include the fixes and changes from the previously posted foundations patch.

    I separated the foundations patch into pieces that help the calendar app, and pieces that are required for the new google sync behaviors patch. I like maintaining just those 2 instead of adding the foundations patch to Preware.

    If you have previously installed the test patches, you need to uninstall all 3: foundations, UC, google sync behaviors. Restart Luna, install the new ones, restart Luna.

    To test these patches: You must uninstall any installed versions. Restart Luna. Install these locally, using Internalz Pro or webOS Quick Install. Restart Luna.

    I have submitted the google sync behaviors patch to Preware, because Preware will add the json file automatically. If you have the test foundations patch installed, you must uninstall it or the sync behaviors patch will fail to install. If you previously tested the local google sync behaviors patch and added the tweaks json file manually, you must delete it before using the Preware version or you will end up with duplicate settings in Tweaks. I have attached the new json file to this post if you don't want to wait for Preware.

    UC changes:
    • added per calendar account advanced sync settings. To access them you need to install the google sync behaviors patch and Tweaks. You will have to enable the feature in Tweaks. After you make changes to the settings you must push the set settings button. They are not possible for exchange accounts. Those accounts follow the email settings.
      • Enable or disable advanced settings
      • Apply setting to contacts from the same account.
      • Set wifi only sync.
      • Set cell data only sync.
      • Minimum battery level required for sync.
      • Sync interval.
      • Require active charging before sync.
      • Require on touchstone for sync.
    • Fixed JSON merging and parsing errors that caused problems with event or JSON imports. This was part of the foundations patch before.
    • sped up month view rendering.
    • modified icon rendering - fixing problems with bad icon files or names
    • created a method to attempt forcing a "re-sync" on an event. -- open the event in the edit scene, use the menu to "Sync event"
    • created a method to help clean "undefined" calendar entries -- open one of the undefined events in the edit scene, use menu item to "Clear Undefined Events". Only removes events from one calendar. If you have multiple calendars you may have to do it for each of them with undefined events. The menu item is only available when it is an undefined event.
    • code cleanup - hopefully better memory usage.
    • method to delete bad events from the database (will do others but, created to compensate for a google bug that leaves and syncs exception events after a series of recurring events has been deleted.)



    Google sync behaviors changes
    • added pieces required for the advanced sync settings.
    • modified tweaks integration
    • add changes from 3.0.5 - sync data filtering, network error handling, regex fix.
    • added filter for the bad google events mentioned above.
    • Adds ability to set metadata in Activity objects, must use the object directly.
    • Adds ability to use ports besides 443 and 80 in Ajax calls.
    • Better cookie handling in Ajax headers
    • Enable network error handling for syncs
    • Enable sync data filtering on events prior to database saving.


    The on,off in tweaks shuts all options off on all calendars. When off, syncing uses the webos standard sync every 20 minutes, 24 hrs for facebook. And the only requirement is Internet access.

    • "Enable requirements" under each account is just an on/off for that account. Off uses defaults.
    • "Use for contacts" allows you to apply the same settings to contacts. If off, contact syncing will use the defaults. So if you only want to sync all data for an account every 3 hours, set it to on. If you want calendar to 3 hours and contacts to default at 20 mins, choose off. The sync processes are separate, but where I had to patch the files I can affect both of them.
    • "Wifi only" will only sync when connected to wifi.
    • "Cell data only" will only connect through the carriers network.
    • *** having them both wifi and cell on, I configured the same as having them both off. If both are on or off, it means you want to sync when either is available.
    • "Minimum battery" is the level which is required to sync. When above it will sync, below it will not. "0" is off.
    • "Interval" is the interval that google servers are queried for changes. All changes made on the device will try to sync immediately or queue up if the requirements are not met.
    • "Charging" phone has to be charging. Usb or touchstone.
    • "On touchstone" touchstone only syncing.
    • "Sync all day" default behavior to sync 24 hrs a day. Turn off or tap to reveal start stop time settings. You cannot turn off all day if your interval is longer than 6 hours.
    • "Start time" time at which sync begins. If the start hour is later than the stop hour, it will treat the start as the previous day. So you can set it to sync over the night if you want.
    • "Stop time" time at which sync ends. It takes effect after the next sync, so you may have a sync that fires after the stop time depending on your set interval. For example: If you have it set for 1 hour interval and a stop time of 21:00. If the second to last sync fires at 20:59. The one at 21:59 will be the last sync. There's just too many problems trying to stop them once they start, preventing them from being rescheduled is safer. Once a sync outside of the window fires, I stop them and schedule a sync to start at the set start time.
    Attached Images Attached Images
    Attached Files Attached Files
    Last edited by frantid; 02/12/2015 at 04:50 PM.
    French Pre3, UK Pre2, US Veer, German gsm Pre, 680, garmin ique 3600 & still have my working palm pilot 1000 with the 1 Mb adapter

    Please remove UberCalendar and google sync behavior patches prior to system updates.
    patch Google calendar sync behavior for 2.x.x and TouchPad (Oauth2 and advanced sync requirements enabled)
    Preference guide for MetaView's UberCalendar patch
  20. #3900  
    I should add the advanced sync requirements pieces of the google sync behaviors patch were inspired by greenoyster's patch

    The new google sync behaviors patch will conflict with that patch. So you must uninstall greenoyster's patch, if you want to use it.
    French Pre3, UK Pre2, US Veer, German gsm Pre, 680, garmin ique 3600 & still have my working palm pilot 1000 with the 1 Mb adapter

    Please remove UberCalendar and google sync behavior patches prior to system updates.
    patch Google calendar sync behavior for 2.x.x and TouchPad (Oauth2 and advanced sync requirements enabled)
    Preference guide for MetaView's UberCalendar patch

Tags for this Thread

Posting Permissions