Page 191 of 207 FirstFirst ... 91141181186187188189190191192193194195196201 ... LastLast
Results 3,801 to 3,820 of 4135
Like Tree55Likes
  1. #3801  
    Did you restart Luna?
  2. #3802  
    Quote Originally Posted by frantid View Post
    Did you restart Luna?
    No I will try again. Thanks!
  3. #3803  
    Quote Originally Posted by Mark S View Post
    No I will try again. Thanks!
    I did. Still some false starts and I figured out what I was doing wrong and now it is installed. Thank you!
  4. #3804  
    Glad you got it sorted.
  5. #3805  
    Any chance you'll ever replace the useless "23 hours" event reminder time with much-needed "12 hours" (still not on TouchPad) and "18 hours" (not on TP or phones) selections?

    Tungsten E, Treo 650, Pre+ (3), Preł (2), TouchPad (2), & my trusty Treo BT headset (in use!)
    Posts: Save/Restore Backup Process & Batch File | Activated! (Verizon Preł Activation) | "Not Enough Space To Download" Fix
  6. #3806  
    Someone must have requested 23 hours. I will add the 12 and 18, though.
  7. #3807  
    is anyone else having an issue with not all of their Google calendars (the events in them) showing up? I'm having this issue with my Pre2 (2.2.4).
    I've tried turning off/on Google calendar via accounts, each individual calendar off/on via ubercalendar but can't get some of the calendars to show up anymore. Odd thing is they still show up on my Touchpad's ubercalendar.
    I did a search but didn't find much help so suggestions are appreciated.
  8. #3808  
    I haven't had any issues lately. Can you put "google" in the custom field in lumberjack, then do a sync now in the calendar app. Let it run for 20 secs or so, then push retrieve log in lumberjack. Post it here I'll take a look.
  9. #3809  
    Quote Originally Posted by frantid View Post
    Someone must have requested 23 hours. I will add the 12 and 18, though.
    Thank you! 12 hours needs to be the default for all-day event reminders.

    -- Sent from my Palm Pre using Forums
  10. #3810  
    Quote Originally Posted by toaste View Post
    is anyone else having an issue with not all of their Google calendars (the events in them) showing up? I'm having this issue with my Pre2 (2.2.4).
    I've tried turning off/on Google calendar via accounts, each individual calendar off/on via ubercalendar but can't get some of the calendars to show up anymore. Odd thing is they still show up on my Touchpad's ubercalendar.
    I did a search but didn't find much help so suggestions are appreciated.
    I've had the same issue crop up on my Pre3 (2.2.4). I had to completely remove my Google account, add it back, and wait for the re-sync (for some reason, it took well over a day--much longer than when I first set up my Pre3 last month). This fixed the issue.

    I seem to recall the same thing happening once or twice on my Pre+ over the 2 1/2 years that I used it; UC was installed for only the last 6 months or so. Again, the only solution that worked was removing and restoring the Google account.

    Tungsten E, Treo 650, Pre+ (3), Preł (2), TouchPad (2), & my trusty Treo BT headset (in use!)
    Posts: Save/Restore Backup Process & Batch File | Activated! (Verizon Preł Activation) | "Not Enough Space To Download" Fix
  11. #3811  
    Quote Originally Posted by bethel95 View Post
    I've had the same issue crop up on my Pre3 (2.2.4). I had to completely remove my Google account, add it back, and wait for the re-sync (for some reason, it took well over a day--much longer than when I first set up my Pre3 last month). This fixed the issue.

    I seem to recall the same thing happening once or twice on my Pre+ over the 2 1/2 years that I used it; UC was installed for only the last 6 months or so. Again, the only solution that worked was removing and restoring the Google account.
    thanks for the suggestion, I thought it might have to be done and now to wait & see if it solves things.
  12. #3812  
    Quote Originally Posted by frantid View Post
    I haven't had any issues lately. Can you put "google" in the custom field in lumberjack, then do a sync now in the calendar app. Let it run for 20 secs or so, then push retrieve log in lumberjack. Post it here I'll take a look.
    heres my log
    undefined[2012-08-31 04:47:17] (12) preferences applied.: 48
    [2012-08-31 04:47:17] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Tue$ $Aug$ $30$ $2011$ $22$:$47$:$17$ $GMT$-$0600$ ($MDT$) $to$ $Tue$ $Aug$ $30$ $2016$ $22$:$47$:$17$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 04:47:20] (status) --->>.: 200
    [2012-08-31 04:47:22] (12) preferences applied.: 48
    [2012-08-31 04:47:22] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Tue$ $Aug$ $30$ $2011$ $22$:$47$:$22$ $GMT$-$0600$ ($MDT$) $to$ $Tue$ $Aug$ $30$ $2016$ $22$:$47$:$22$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 04:47:23] (status) --->>.: 200
    [2012-08-31 04:47:30] (12) preferences applied.: 48
    [2012-08-31 04:47:30] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Personal$' $from$ $Tue$ $Aug$ $30$ $2011$ $22$:$47$:$30$ $GMT$-$0600$ ($MDT$) $to$ $Tue$ $Aug$ $30$ $2016$ $22$:$47$:$30$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 04:47:33] (status) --->>.: 200
  13. #3813  
    Can you let it run longer before hitting retrieve? Those are good, without error. Status 200 means error free. If you see anything else then something might be wrong. Have you tried changing the events that don't sync? Just add a note or a word to the note. That would be enough to change the revision number and force a sync.
  14. #3814  
    Updated local versions -- added 12 and 18 hours:

    2.1 versions


    2.2.x versions:

    1.4.5 version

    Touchpad - also fixed a bug in timezone conversion

    please let me know if you get any issues.

    cheers
    French Pre3, UK Pre2, US Veer, German gsm Pre, 680, garmin ique 3600 & still have my working palm pilot 1000 with the 1 Mb adapter

    Please remove UberCalendar and google sync behavior patches prior to system updates.
    patch Google calendar sync behavior for 2.x.x and TouchPad (Oauth2 and advanced sync requirements enabled)
    Preference guide for MetaView's UberCalendar patch
  15. #3815  
    Quote Originally Posted by frantid View Post
    Can you let it run longer before hitting retrieve? Those are good, without error. Status 200 means error free. If you see anything else then something might be wrong. Have you tried changing the events that don't sync? Just
    add a note or a word to the note. That
    would be enough to change the revision
    number and force a sync.
    I changed an event via desktop & the change shows on the touchpad, but its still missing on the phone after more than 10 minutes.
    here's a longer log
    undefined[2012-08-31 17:15:40] (status) --->>.: 200
    [2012-08-31 17:15:41] (12) preferences applied.: 48
    [2012-08-31 17:15:41] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Household$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$15$:$41$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$15$:$41$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:15:42] (status) --->>.: 200
    [2012-08-31 17:15:43] (12) preferences applied.: 48
    [2012-08-31 17:15:43] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Family$ $events$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$15$:$43$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$15$:$43$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:15:44] (status) --->>.: 200
    [2012-08-31 17:15:44] (12) preferences applied.: 48
    [2012-08-31 17:15:44] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Family$ $events$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$15$:$44$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$15$:$44$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:15:45] (status) --->>.: 200
    [2012-08-31 17:15:47] (12) preferences applied.: 48
    [2012-08-31 17:15:47] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Family$ $events$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$15$:$47$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$15$:$47$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:15:48] (status) --->>.: 200
    [2012-08-31 17:15:48] (12) preferences applied.: 48
    [2012-08-31 17:15:48] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$General$ $Appointments$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$15$:$48$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$15$:$48$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:15:50] (status) --->>.: 200
    [2012-08-31 17:15:50] (12) preferences applied.: 48
    [2012-08-31 17:15:50] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$General$ $Appointments$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$15$:$50$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$15$:$50$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:15:51] (status) --->>.: 200
    [2012-08-31 17:15:54] (12) preferences applied.: 48
    [2012-08-31 17:15:54] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$General$ $Appointments$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$15$:$54$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$15$:$54$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:15:55] (status) --->>.: 200
    [2012-08-31 17:15:55] (12) preferences applied.: 48
    [2012-08-31 17:15:55] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$General$ $Appointments$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$15$:$55$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$15$:$55$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:15:57] (status) --->>.: 200
    [2012-08-31 17:15:57] (12) preferences applied.: 48
    [2012-08-31 17:15:57] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Lodge$ $Meetings$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$15$:$57$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$15$:$57$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:15:59] (status) --->>.: 200
    [2012-08-31 17:16:01] (12) preferences applied.: 48
    [2012-08-31 17:16:01] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Lodge$ $Meetings$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$01$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$01$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:03] (status) --->>.: 200
    [2012-08-31 17:16:05] (12) preferences applied.: 48
    [2012-08-31 17:16:06] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Lodge$ $Meetings$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$05$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$05$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:07] (status) --->>.: 200
    [2012-08-31 17:16:08] (12) preferences applied.: 48
    [2012-08-31 17:16:08] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Lodge$ $Meetings$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$08$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$08$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:29] (status) --->>.: 500
    [2012-08-31 17:16:29] (12) preferences applied.: 48
    [2012-08-31 17:16:29] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$29$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$29$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:30] (status) --->>.: 200
    [2012-08-31 17:16:32] (12) preferences applied.: 48
    [2012-08-31 17:16:32] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$32$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$32$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:33] (status) --->>.: 200
    [2012-08-31 17:16:35] (12) preferences applied.: 48
    [2012-08-31 17:16:35] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$35$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$35$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:36] (status) --->>.: 200
    [2012-08-31 17:16:38] (12) preferences applied.: 48
    [2012-08-31 17:16:38] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$38$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$38$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:39] (status) --->>.: 200
    [2012-08-31 17:16:41] (12) preferences applied.: 48
    [2012-08-31 17:16:41] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$41$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$41$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:42] (status) --->>.: 200
    [2012-08-31 17:16:43] (12) preferences applied.: 48
    [2012-08-31 17:16:43] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$43$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$43$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:44] (status) --->>.: 200
    [2012-08-31 17:16:46] (12) preferences applied.: 48
    [2012-08-31 17:16:46] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$46$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$46$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:47] (status) --->>.: 200
    [2012-08-31 17:16:48] (12) preferences applied.: 48
    [2012-08-31 17:16:48] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$48$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$48$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:49] (status) --->>.: 200
    [2012-08-31 17:16:51] (12) preferences applied.: 48
    [2012-08-31 17:16:51] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$51$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$51$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:53] (status) --->>.: 200
    [2012-08-31 17:16:54] (12) preferences applied.: 48
    [2012-08-31 17:16:54] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$54$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$54$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:56] (status) --->>.: 200
    [2012-08-31 17:16:57] (12) preferences applied.: 48
    [2012-08-31 17:16:57] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$57$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$57$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:58] (status) --->>.: 200
    [2012-08-31 17:16:59] (12) preferences applied.: 48
    [2012-08-31 17:16:59] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$59$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$59$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:17:00] (status) --->>.: 200
    [2012-08-31 17:17:01] (12) preferences applied.: 48
    [2012-08-31 17:17:01] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$17$:$01$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$17$:$01$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:17:03] (status) --->>.: 200
    [2012-08-31 17:17:04] (12) preferences applied.: 48
    [2012-08-31 17:17:04] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$17$:$04$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$17$:$04$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:17:05] (status) --->>.: 200
    [2012-08-31 17:17:07] (12) preferences applied.: 48
    [2012-08-31 17:17:07] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$17$:$07$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$17$:$07$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:17:08] (status) --->>.: 200
    [2012-08-31 17:17:09] (12) preferences applied.: 48
    [2012-08-31 17:17:09] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$17$:$09$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$17$:$09$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:17:10] (status) --->>.: 200
    [2012-08-31 17:17:11] (12) preferences applied.: 48
    [2012-08-31 17:17:11] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$17$:$11$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$17$:$11$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:17:12] (status) --->>.: 200
    [2012-08-31 17:17:13] (12) preferences applied.: 48
    [2012-08-31 17:17:13] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$17$:$13$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$17$:$13$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:17:16] (status) --->>.: 200
    [2012-08-31 17:17:16] (12) preferences applied.: 48
    [2012-08-31 17:17:16] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$17$:$16$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$17$:$16$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:17:17] (status) --->>.: 200
    [2012-08-31 17:17:17] (12) preferences applied.: 48
    [2012-08-31 17:17:17] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Personal$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$17$:$17$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$17$:$17$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:17:20] (status) --->>.: 200
    Last edited by toaste; 08/31/2012 at 12:35 PM. Reason: new info
  16. #3816  
    Quote Originally Posted by toaste View Post
    I changed an event via desktop & the change shows on the touchpad, but its still missing on the phone after more than 10 minutes.
    here's a longer log

    [2012-08-31 17:16:08] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Lodge$ $Meetings$' $from$ $Wed$ $Aug$ $31$ $2011$ $11$:$16$:$08$ $GMT$-$0600$ ($MDT$) $to$ $Wed$ $Aug$ $31$ $2016$ $11$:$16$:$08$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 17:16:29] (status) --->>.: 500
    This is the only error code in your log -- generic internal server error. See here, scroll down to error codes:
    https://developers.google.com/gdata/...erence#Queries

    I searched google, seems to be a number of reasons for it: too many invites not responded to, a google notice about the account not acknowledged. If you log into your gmail account on the web, search for any messages about that calendar "Lodge Meetings" or account. Do you own it or is it shared from someone else?
    French Pre3, UK Pre2, US Veer, German gsm Pre, 680, garmin ique 3600 & still have my working palm pilot 1000 with the 1 Mb adapter

    Please remove UberCalendar and google sync behavior patches prior to system updates.
    patch Google calendar sync behavior for 2.x.x and TouchPad (Oauth2 and advanced sync requirements enabled)
    Preference guide for MetaView's UberCalendar patch
  17. TimBoch's Avatar
    Posts
    312 Posts
    Global Posts
    318 Global Posts
    #3817  
    Quote Originally Posted by toaste View Post
    heres my log
    undefined[2012-08-31 04:47:17] (12) preferences applied.: 48
    [2012-08-31 04:47:17] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Tue$ $Aug$ $30$ $2011$ $22$:$47$:$17$ $GMT$-$0600$ ($MDT$) $to$ $Tue$ $Aug$ $30$ $2016$ $22$:$47$:$17$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 04:47:20] (status) --->>.: 200
    [2012-08-31 04:47:22] (12) preferences applied.: 48
    [2012-08-31 04:47:22] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Masonic$' $from$ $Tue$ $Aug$ $30$ $2011$ $22$:$47$:$22$ $GMT$-$0600$ ($MDT$) $to$ $Tue$ $Aug$ $30$ $2016$ $22$:$47$:$22$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 04:47:23] (status) --->>.: 200
    [2012-08-31 04:47:30] (12) preferences applied.: 48
    [2012-08-31 04:47:30] (calendar.google.jsjsjs) $user$.$err$: [$com$.$palm$.$service$.$calendar$.$google$] ----&$gt$;&$gt$;&$gt$;&$gt$; $Sync$ $window$ $for$ $calendar$ '$Personal$' $from$ $Tue$ $Aug$ $30$ $2011$ $22$:$47$:$30$ $GMT$-$0600$ ($MDT$) $to$ $Tue$ $Aug$ $30$ $2016$ $22$:$47$:$30$ $GMT$-$0600$ ($MDT$)
    [2012-08-31 04:47:33] (status) --->>.: 200
    Interesting to see that someone else has a Masonic calendar
    Tim Boche

    Palm IIIe, IIIx, IIIxe, IIIc, ClieT615, ClieTJ25, ClieTJ37(2), Treo600, Treo650, Centro(AT&T & Verizon),
    Pre Plus(6 replacements), TouchPads(1-16gb,2-32gb), Pre2 (and a spare)
    toaste likes this.
  18. #3818  
    All the updates are in Preware.
    French Pre3, UK Pre2, US Veer, German gsm Pre, 680, garmin ique 3600 & still have my working palm pilot 1000 with the 1 Mb adapter

    Please remove UberCalendar and google sync behavior patches prior to system updates.
    patch Google calendar sync behavior for 2.x.x and TouchPad (Oauth2 and advanced sync requirements enabled)
    Preference guide for MetaView's UberCalendar patch
  19. #3819  
    Should I have uninstalled UberCalendar HD before I installed the LunaCE patch?

    I now have the situation where the patch can't be updated and it can't be uninstalled either. I am pretty sure that this method you posted a link to earlier would work to fix it, so all is not lost:

    UberCalendar: Enhanced calendar patch


    But I don't know if it just got randomly messed up or if LunaCE might have conflicted somehow that I don't understand. So, I guess I am trying to figure out if other people should uninstall UC before they install LunaCE?
  20. #3820  
    I'm not sure. Anyone else have a problem with it? I do not know what would cause the conflict. You could ask in the LunaCE thread. UC doesn't modify any files related to luna.

Tags for this Thread

Posting Permissions