Results 1 to 2 of 2
  1. drwillec's Avatar
    Posts
    75 Posts
    Global Posts
    76 Global Posts
       #1  
    Just upgraded to a vzw pre 2 from pre plus. In the account preferences, I can change the order of the 4 different accounts that I have - and this changes the order that they appear below the favorites. However, in the favorites, the order of the starred inboxes is not the way it is set up in the preferences. I cannot seem to be able to change this at all. Any one else with this problem?
  2. drwillec's Avatar
    Posts
    75 Posts
    Global Posts
    76 Global Posts
       #2  
    loaded web os 2.10 and this fixed the problem.

Posting Permissions