Results 1 to 3 of 3
  1. ike301's Avatar
    Posts
    424 Posts
    Global Posts
    474 Global Posts
       #1  
    I know, i know, so i'm lazy to scroll down. Just harder when on the move.

    I added another Quick Text which was "Text you back in a bit, I am losing connection right now".

    I figured this would come handy as I go through dead zones and lose connection. But usually by the time I scroll down with one hand (usually the very last hidden row), I'm already in the dead zone.

    Any way I can rearrange (or even delete) the other presets ('Cant Talk', 'Please call XXX_XXXX')?
    Sprint Treo 755p (ex-650) user and loving it.
    1.04-SPNT
  2. #2  
    sure...go to Options -> Preferences ->Pre-defined Msgs

    select the messages you don't want and delete them.

    viola!
  3. ike301's Avatar
    Posts
    424 Posts
    Global Posts
    474 Global Posts
       #3  
    *edited*

    you have to open it and then delete it. DUH. thanks!
    Sprint Treo 755p (ex-650) user and loving it.
    1.04-SPNT

Posting Permissions